North dakota
With a load of 120MW, this project was signed with the power plant on December 29, 2023, and energized in August 2024. It is our largest project to date and an air-cooled facility, located within a 3,000-acre power plant campus, just a one-hour drive from Bismarck, North Dakota.
The power plant provides over 1,000MW of baseload generation, supported by abundant nearby coal reserves that can sustain operations for the next 60 years. With summer temperatures ranging from 16°C to 29°C, the region provides an optimal environment for air-cooled mining operations and consistent uptime.